跳转至

Infra-006: Documentation Engineering

Status: In Progress
Owner: Infra
Priority: P2
Branch: feat/ssot-bootstrap-pitfalls

Goal

Establish a repeatable documentation engineering workflow with measurable link reachability.

Context

The wiki has multiple entry points and deep references; we need consistent navigation, reachability, and maintenance checks.

Scope

  • [x] Define L0/L1/L2 entry map and update cross-links.
  • [x] Add a lightweight link reachability check (script or checklist).
  • [x] Normalize entry ordering across key docs for discoverability.

Deliverables

  • L0/L1/L2 entry map documented in AGENTS and docs index.
  • Link reachability report or checklist for reviews.
  • Updated navigation ordering across L1 entry docs.
  • None yet.

Change Log

Date Change
2025-12-31 Initialized project
2025-12-31 Standardized L1 entry ordering and labels across docs
2025-12-31 Added reachability report and PageRank findings
2025-12-31 Linked Bootstrap/E2E subdocs and closed reachability gaps
2025-12-31 Added TODOWRITE links for active projects and refreshed metrics

Verification

  • [ ] L0 to L2 docs are reachable in <= 2 hops.
  • [ ] Link check passes for local docs.

TODOWRITE

References